Adding Solar Panels to Your Existing System in Arizona: What to Check First
A new EV, a pool pump or a bigger bill has a lot of Arizona solar owners asking whether they can just add a few more panels. Often you can, but the inverter, the warranty, your utility's rules and your electrical panel all get a say. Here's what to check before you get a quote.
“The price was in budget and they were able to accommodate our roofer's schedule.”
Suzette L. · Google Review
“I highly recommend Solar Fix for their caring approach and top-notch service!”
Melissa D. · Google Review
“Very refined process in place here with lots of communication.”
Brian G. · Google Review
The short answer
You can often add panels to a solar system you already own. But it's not as simple as bolting a few more onto the roof. Four things decide how it goes:
1. Your inverter. It has to be able to take the extra power, or you need a second one. 2. Your warranty. Changing the system can affect the warranty from the original installer or the manufacturer. 3. Your utility. APS, SRP and TEP each need to approve added capacity, and a bigger system can change your export credits. 4. Your electrical panel. More solar can mean a bigger solar breaker, which your panel may or may not allow.
A solar assessment that looks at all four is the best first step before you get quotes.
Start with the inverter
The inverter turns the DC power from your panels into AC power for your home. What kind you have shapes what's possible.
- ▸Microinverters, such as Enphase, sit under each panel. Since each panel has its own inverter, adding panels doesn't require reconfiguring the existing system. You still need compatible equipment and a properly sized circuit back to your panel.
- ▸String inverters are a single box on the wall that a whole row of panels feeds into. You can add panels if the inverter has an unused input, or if an existing string can grow and still stay inside the inverter's limits. If it's already at its limit, new panels need a new inverter.
- ▸Optimizer systems, such as SolarEdge, fall in between. New panels need optimizers that work with the inverter you already have.
On string systems, one common option is to leave the original system alone and add a small, separate array with its own microinverters. That keeps the original system and its warranty untouched.
Matching matters too. Panels made today usually have different electrical ratings than panels from eight or ten years ago. Mixing them on the same string can pull down the output of the whole string, so the new panels need to be designed in, not just added on.
Check your warranty before anyone touches the system
Depending on how your system was installed, adding panels without their involvement could risk voiding your warranty. Some panel and inverter makers also have rules about mixing brands or models.
Before you get a quote, find your original contract and the manufacturer warranties. Look for language about changes, additions or work by other contractors. If your installer is still in business, ask them in writing whether an add-on by another company affects their coverage. If your installer is out of business, there may be no workmanship warranty left to protect, but the manufacturer warranties on the panels and inverter can still apply.
What your utility needs to know
Adding panels means adding generating capacity, so your utility has to approve it before the new panels are turned on.
- ▸APS. An installer normally submits the interconnection application for you. APS's engineering guidance has allowed system expansions as long as the disconnect switches are properly labeled and contain switch numbers, such as "1 of 2" and "2 of 2."
- ▸SRP. New and changed systems go through SRP's online interconnection process, and SRP requires an active SRP account at the location where the system will be installed.
- ▸TEP. Installer guides note that homeowners expanding an existing system have their installer submit a new application to TEP.
The export rate question
This is the part most people don't know to ask about. Many Arizona solar customers have an export credit rate that was set when their system was first connected.
At APS, each customer's initial RCP rate will be applicable for 10 years from the time of their interconnection. The APS rider that sets that rate has said that a capacity increase greater than 10% or 1 kW, whichever is greater, ends eligibility for the original locked rate. After that, credits are based on the current RCP rate locked in for a period of ten years minus the number of years they received service under a prior RCP rate.
In plain terms: on APS, a larger add-on could move your export credits to whatever the rate is today, which may be lower than what you locked in. Rules change, so ask APS or your installer what applies to your account before you commit.
SRP customers on older solar price plans face a similar question as SRP moves solar customers to newer plans. Our page on Arizona power rates covers the bigger picture. For your own account, get the answer from SRP in writing.
Don't forget the electrical panel
More solar usually means a bigger solar breaker, or a second one. The electrical code limits how much can feed your main panel, which is why some add-ons run into the 120% rule. Our guide on whether you need a main panel upgrade for solar or a battery explains how that works and what the alternatives are.
Our electrical services team handles the breaker, disconnect and labeling side of an add-on.
When a battery makes more sense
If your system already sends a lot of power to the grid at midday, more panels mostly add more midday exports. With lower export credits, a battery may do more for your bill than extra panels, because it stores midday solar for the evening. It also gives you backup in an outage. Our battery backup and solar storage page explains the options.
What to have ready
Before you ask anyone for a quote, gather:
- ▸A photo of the inverter label (brand, model and size).
- ▸A photo of your main electrical panel label.
- ▸Your original solar contract and warranty paperwork.
- ▸Your utility, rate plan and roughly when the system was connected.
- ▸A year of bills or monitoring data, so the add-on can be sized to what you actually use.
The bottom line
Adding panels to an existing system is often possible, but the inverter, the warranty, your utility's rules and your electrical panel all shape the answer. The export rate is the easiest thing to miss. Gather your paperwork, check how an add-on affects your rate, and have a licensed solar company look at the whole system before you decide between more panels, a separate array or a battery. A solar assessment is a good place to start, and solar panel installation covers the add-on itself.
FAQ
Can I add panels to my existing solar system?+
Often, yes. How easy it is depends mostly on your inverter. Microinverter systems are usually the simplest to add to. String inverter systems may need spare inverter capacity, a second inverter, or a separate small system next to the first one.
Will adding panels change my export rate with APS?+
It can. APS's tariff for its export credit rate has said that growing a system by more than 10% or 1 kW, whichever is greater, ends the original locked-in rate. Check the current rules with APS or your installer before you sign anything.
Do I need to tell the utility?+
Yes. Adding generating capacity is an interconnection change, so the utility needs an application before the new panels are turned on. Your installer usually submits it for you.
Related: Solar assessment · Solar panel installation · Electrical services · Do you need a main panel upgrade for solar or a battery? · Arizona power rates
Thinking about adding panels?
Send SolarFIX a photo of your inverter label, your main electrical panel label, your utility and roughly when the system went in. We'll help you sort out what an add-on would involve and whether a battery or a separate system makes more sense.